We don’t just construct hydropower structures; we create projects that inspire confidence, stand resilient against the test of time, and deliver reliable, clean energy to the communities that depend on it. Our commitment goes beyond mere construction.












We’re not just about power generation; we’re about sustainability, innovation, and long-term community growth. At Aayu Malun Hydropower, our mission is to harness Nepal’s natural energy responsibly, delivering clean and reliable electricity that empowers
Our 21 MW Aayu Malun Khola Hydropower Project is located in the Sagarmatha Zone of Koshi Province, spanning across Okhaldhunga and Solukhumbu districts. The intake lies in Malun Rural Municipality Ward 6 & 7, while the powerhouse is located in Ward 5. The transmission line traverses Rangadip, Patale, Bigutar, Jantarkhani, Kerun, and Tingla before connecting to the Tingla Substation.


Founded with a vision to develop clean, renewable hydropower responsibly, Aayu Malun Hydropower Pvt. Ltd. combines decades of engineering experience, strong technical leadership, and a commitment to sustainable development.
The Aayu Malun Khola Hydropower Project generates 21 MW of clean electricity through a run-of-river scheme utilizing Malun Khola. With a net head of 524.1 m, design discharge of 4.52 m³/s, and Pelton turbines (90.9% efficiency), the plant ensures reliable.

Deliver reliable renewable energy through sustainable hydropower development for Nepal’s future growth.
To generate clean, reliable, and sustainable energy by harnessing the natural power of water—empowering communities, protecting the environment, and driving a greener future.
To be a global leader in hydropower, setting the standard for sustainable energy development while creating a positive impact on people, ecosystems, and the planet.
Our work is guided by ethical principles and a dedication to transparency, ensuring that every project we undertake meets the highest standards of safety and accountability.


Our philosophy is simple, hire great people and give them the resources and support to do their best work.







Loading contact information...
Have a look at my most frequently asked questions.
The project significantly enhances regional socio-economic development through employment generation, improved access infrastructure, and local service engagement. At the national level, it contributes approximately 112.58 GWh of clean energy annually, s
Key technical parameters include: Installed Capacity: 21 MW Turbine Type: Horizontal Pelton (3 units) Net Head: 524.1 meters Design Discharge: 4.52 m³/s Headrace Tunnel Length: 1,903.14 meters Penstock Length: 1,656.30 meters Transmission Line: 132 kV, 1
The project’s Required Commercial Operation Date (RCOD) is 11 September 2025. Civil, hydro-mechanical, and electro-mechanical works are progressing in accordance with the approved implementation schedule, with several components already completed and oth
The project is being developed by Aayu Malun Hydropower Pvt. Ltd., a professionally managed private company with extensive experience in hydropower planning, construction, and project execution. The company is supported by seasoned technical experts, est
The Aayu Malun Khola Hydropower Project is a 21 MW run-of-river hydropower facility located in Okhaldhunga and Solukhumbu districts, Koshi Province. The project harnesses the hydrological potential of Malun Khola to generate reliable, clean, and renewabl
Our philosophy is simple, hire great people and give them the resources and support to do their best work.
Go to Up